KL Tower – Fallprotec
- Home
- Our Projects
- KL Tower – Fallprotec
KL Tower – Fallprotec
Earlier this year Dscaff signed an exclusive distribution agreement with global market leader Fallprotec for the Malaysian market.
Fallprotec designs and supplies Vertical and Horizontal Fall Arrest and Safe Access solutions.
Dscaff was awarded and implemented the design, supply and installation contract from MainCon Syaqui Excellence, for the redevelopment of maintenance Level T0-2 to the Walk on the Edge tourist attraction on the Iconic Menara KL or KL Tower here in Kuala Lumpur. The system is a closed loop with up to 30 users at maximum capacity, allowing seamless mobility via state-of-the-art, Stainless steel Nav 7 Trolleys.
Dscaff and Fallprotec scope of work included designing the dual curved Safe Access Rails for visitors Fall Protection as well as the Rope Access / Suspended Works for the maintenance and rescue teams as well as the supply of visitors Personal Fall Protective Equipment (PFPE)